As part of planning activities for the CP Hill waterline replacement, subsurface utility discovery work needs to be performed along selected portio…
Award Number: DE-EE0006731CXs Applied: A9, A11, B3.1Geothermal Technologies OfficeLocation: NVOffice: Golden Field Office
Building 23-517, also known as the Bowling Alley, is located in Area 23 (Mercury) at the Nevada National Security Site (NNSS). This building has no…
The Mercury Solar Expansion Project would install a solar photovoltaic (PV) array on the south side of Mercury Fire Station No. 1 in Area 23 (Mercu…
The Atlas facility, located in Building 06-922 at the Nevada National Security Site (NNSS) was constructed in 2003 and conducted Pulsed Power resea…
As part of planning activities for future water and sewer line upgrades, subsurface utility discovery work would be performed along selected portio…
An emergency response exercise would be conducted at the Device Assembly Facility (DAF), located in Area 6 of the Nevada National Security Site (NN…
Categorical Exclusion Determination
Various Force-on-Force and Engagement Simulation System (ESS) training exercises for Nevada Field Office (NFO) security personnel would take place …
Award Number: DE-EE0006731CX(s) Applied: A9, B3.1, B3.6 Geothermal Technologies OfficeLocation(s): NVOffice(s): Golden Field Office