Installation of steel covers over 50 copper transformer grounds at 31 substations to reduce the risk of theft or vandalism. …
Powerex Corp. has applied for renewed authorization to transmit electric energy from the United States to Canada pursuant to section 202(e) of the Federal Power Act (FPA).
Altop Energy Investments LP has applied for authorization to transmit electric energy from the United States to Mexico pursuant to Section 202(e) of the Federal Power Act (FPA).
OIKO Energy Inc. has applied for authorization to transmit electric energy from the United States to Canada pursuant to Section 202(e) of the Federal Power Act (FPA).
XTS LLC has applied for authorization to transmit electric energy from the United States to Mexico pursuant to Section 202(e) of the Federal Power Act (FPA).
Renovation of PGH B-921 and/or MGN B-26 3rd floor to refresh outdated office spaces to support and enhance NETL's workplace improvement strategies.…
The project would develop a pilot facility in San Bernadino CA to advance the readiness of a novel approach to the Biomass Carbon Removal and Stora…
This project seeks to develop domestic coal- and waste coal-derived hard carbon anodes that, when coupled with domestic cathodes, will develop a ne…
This project will focus on the development of a potential alternative material to GaN. …
Development and manufacture of a low-cost integrated system for eliminating methane emissions from natural gas engines. …