Wind Forecast Improvement Project 2 (WFIP2), Goldendale (Monitoring Trailer), ASO-CX-316 CX(s) Applied: B3.1Date: 07/15/2015 Location(s): IllinoisOffices(s): Argonne Site Office
Flue Gas Water Vapor Latent Heat Recovery for Pressurized Oxy-Combustion CX(s) Applied: A1, A9, B3.6Date: 07/09/2015 Location(s): IllinoisOffices(s): National Energy Technology Laboratory
Energy Savings with Acceptable Indoor Air Quality Through Improved Air Flow Control Award Number: DE-EE0007057 CX(s) Applied: A9, B3.1 Building Technologies Office Date: 06/26/2015 Location(s): IL Office(s): Golden Field Office
Production, Quality Control and Shipment of Radionuclides from the University of Washington CX(s) Applied: B3.6Date: 06/11/2015 Location(s): IllinoisOffices(s): Chicago Office
Installation Of a Portable Sensitive Compartmented Information Facility at the Nuclear Response Group Readiness Operations Center CX(s) Applied: A1, A9, B3.6Date: 06/01/2015 Location(s): IllinoisOffices(s): NNSA-Headquarters
Demolition of F0 Trailers CX(s) Applied: B1.16, B1.23Date: 05/27/2015 Location(s): IllinoisOffices(s): Fermi Site Office
Main Ring Service Buildings E2 and E3 Demolition CX(s) Applied: B1.16, B1.17, B1.23Date: 04/23/2015 Location(s): IllinoisOffices(s): Fermi Site Office
Site-Wide Categorical Exclusion: Routine Maintenance CX(s) Applied: B3.1Date: 04/23/2015 Location(s): IllinoisOffices(s): Fermi Site Office
Compressor-less Hydrogen Refueling Station Award Number: DE-EE0006966 CX(s) Applied: B3.6 Fuel Cell Technologies Office Date: 04/20/15 Location(s): IL Office(s): Golden Field Office
Fermi National Accelerator Laboratory- Industrial Complex Buildings Addition CX(s) Applied: B1.15Date: 04/02/2015 Location(s): IllinoisOffices(s): Fermi Site Office