Building 350 Legacy Project CX(s) Applied: B1.16, B1.24, B1.28, B1.30Date: 07/18/2016 Location(s): IllinoisOffices(s): Argonne Site Office
Tree Removals at Building 300 CX(s) Applied: B1.3Date: 06/20/2016 Location(s): IllinoisOffices(s): Argonne Site Office
Oak Tree Removal by Building 221 CX(s) Applied: B1.3Date: 06/17/2016 Location(s): IllinoisOffices(s): Argonne Site Office
Holometer Reconfiguration CX(s) Applied: B1.15Date: 42521 Location(s): IllinoisOffices(s): Fermi Site Office
ASO-CX-326 Construction and Operation of SBA Cellular Tower on Argonne Site CX(s) Applied: B1.19Date: 05/25/2016 Location(s): IllinoisOffices(s): Argonne Site Office
Construction and Operation of SBA Cellular Tower CX(s) Applied: B1.19Date: 05/25/2016 Location(s): IllinoisOffices(s): Argonne Site Office
Development of a Planar Focusing Collector for CSP Award Number: DE-EE0007339 CX(s) Applied: A9, B3.6 Solar Energy Technology Office Date: 04/06/2016 Location(s): IL Office(s): Golden Field Office
Demolition of Trailer 121 CX(s) Applied: B1.16, B1.23Date: 03/31/2016 Location(s): IllinoisOffices(s): Fermi Site Office
Demolition of Main Ring Gazebo Structure CX(s) Applied: B1.16, B1.23Date: 03/31/2016 Location(s): IllinoisOffices(s): Fermi Site Office
Site Environmental Characterization and Monitoring CX(s) Applied: B3.1, B3.2Date: 03/15/2016 Location(s): IllinoisOffices(s): Argonne Site Office