Cyber Resilient Energy Delivery Consortium (CREDC) CX(s) Applied: A1, A9, A11, B1.3, B1.7, B3.6Date: 08/24/2015 Location(s): IllinoisOffices(s): National Energy Technology Laboratory
Novel Biphasic Carbon Dioxide Absorption Process w/ Multiple Stages of Phase Separation... CX(s) Applied: A9, B3.6Date: 08/10/2015 Location(s): IllinoisOffices(s): National Energy Technology Laboratory
Brine Extraction and Treatment Strategies to Enhance Pressure Management and Control of Carbon Dioxide Plumes in Deep Geologic Formations CX(s) Applied: A9Date: 08/03/2015 Location(s): IllinoisOffices(s): National Energy Technology Laboratory
Meson Hill Well Abandonment CX CX(s) Applied: B3.1Date: 07/24/2015 Location(s): IllinoisOffices(s): Fermi Site Office
Advanced Photon Source Upgrade Project - Multi-Bend Achromat Storage Rings and Superconducting Insertion Devices CX(s) Applied: B1.23, B1.31Date: 07/17/2015 Location(s): IllinoisOffices(s): Argonne Site Office
Building 200 Steam and Condensate Repairs, ASO-CX-318 CX(s) Applied: B1.3Date: 07/15/2015 Location(s): IllinoisOffices(s): Argonne Site Office
Argonne Enterprise Data Center, ASO-CX-317 CX(s) Applied: B1.15Date: 07/15/2015 Location(s): IllinoisOffices(s): Argonne Site Office
Argonne's Washington, DC Office Renovation, ASO-CX-319 CX(s) Applied: B1.15Date: 07/15/2015 Location(s): IllinoisOffices(s): Argonne Site Office
Wind Forecast Improvement Project 2 (WFIP2), Walla Walla (Monitoring Trailer), ASO-CX-315 CX(s) Applied: B3.1Date: 07/15/2015 Location(s): IllinoisOffices(s): Argonne Site Office
Wind Forecast Improvement Project 2 (WFIP2), Yakima (Monitoring Trailer), ASO-CX-314 CX(s) Applied: B3.1Date: 07/15/2015 Location(s): IllinoisOffices(s): Argonne Site Office