SBIR/STTR Phase 0 Outreach and Assistance Program CX(s) Applied: A8Date: 41844 Location(s): IllinoisOffices(s): Chicago Office
C-Zero Detector Hall and Neutrino Target Service Facility Renovation to Provide for a Radioactive Materials Storage Facility CX(s) Applied: B1.10, B1.15, B1.23Date: 41830 Location(s): IllinoisOffices(s): Fermi Site Office
Accelerator Division Cryogenic Department Engineering Office and Meson West 9 Work Activity CX(s) Applied: B3.6Date: 41828 Location(s): IllinoisOffices(s): Fermi Site Office
An Evaluation of the Carbon Sequestration Potential of the Cambro-Ordovician Strata of the Illinois CX(s) Applied: B3.1 Date: 07/02/2014 Location(s): Illinois Offices(s): National Energy Technology Laboratory
Sawmill Creek Stream Bank Erosion CX(s) Applied: B1.3 Date: 06/06/2014 Location(s): Illinois Offices(s): Argonne Site Office
The U.S. Department of Agriculture Forest Service - Slow the Spread of Gypsy Moth CX(s) Applied: B1.3 Date: 06/06/2014 Location(s): Illinois Offices(s): Argonne Site Office
A Hybrid Catalytic Route to Fuels from Biomass Syngas CX(s) Applied: B3.6 Date: 05/29/2014 Location(s): Georgia, Illinois Offices(s): Golden Field Office
Microbial Laboratory Analysis CX(s) Applied: B3.12 Date: 05/06/2014 Location(s): Illinois Offices(s): Argonne Site Office
Emerald Ash Borer Control CX(s) Applied: B1.3 Date: 05/06/2014 Location(s): Illinois Offices(s): Argonne Site Office
Innovative Energy Program - Shedd Energy Storage Project CX(s) Applied: B1.31 Date: 02/10/2014 Location(s): Illinois Offices(s): Golden Field Office