A series of three culverts on Giese Road will be replaced due to structural concerns and to improve the flow of Indian Creek. The existing roadway…
On June 8, 2025, the Fermilab Fire Department (FFD) was dispatched to Lab A for an Automatic Fire Alarm (AFA). Upon investigation, crews discovered…
Flooding into NM3 and 4 building was discovered in July. Investigation revealed a domestic water leak from a cross pipe running between NS2 and NM5…
On June 8, 2025, the Fermilab Fire Department (FFD) was dispatched to Lab A for an Automatic Fire Alarm (AFA).
Flooding into NM3 and 4 building was discovered in July. Investigation revealed a domestic water leak from a cross pipe running between NS2 and NM5.
Due to severe weather, there was a downed power line on Eola Rd that needed to be repaired. There was no alternative available, because several sit…
Due to severe weather, there was a downed power line on Eola Rd that needed to be repaired.
This review is supplemental documentation to the existing and approved PIP II Environmental Assessment (EA) ID No. DOE/EA-2072 and Finding of No Significant Impact (FONSI).
DOE and the DOE DOGE Team identified a land asset located in Illinois which DOE had acquired to support an energy-related project which has since b…
The Rinaker-Palmyra Tie Line Project includes right-of-way vegetation clearing along new and existing easements, as well as construction and instal…