This project will include vegetation management in the right of ways (ROW) identified in the map provided an in 57.7 miles of ROW. The work will in…
      Tree trimming, tree clearing, and vegetation management in electric distribution right-of-ways in the Golconda North Substation distribution system…
      Vegetation Management (tree trimming, brush reduction, etc.) around distribution power lines in existing Right of Ways (ROWs).…
      The project involves replacing existing meters with new, advanced meters and metering equipment throughout SIEC's service territory. The installati…
      EECA proposes the dedication of approx two (2) acres for development of a new warehouse facility (60'x150' shed) and outside rock/concrete covered …
      The Rinaker-Palmyra Tie Line Project includes right-of-way vegetation clearing along new and existing easements, as well as construction and instal…
      The City of Newton is proposing the Line D Rebuild and Reconductoring project to replace aging copper wiring with aluminum wiring, and upgrading th…
      The U.S. Department of Energy (DOE) is proposing to provide federal funding to Celadyne Technologies for the development and advancement of membran…
      The U.S. Department of Energy (DOE) is proposing provide federal funding to NETenergy for the design and development of a high efficiency closed-lo…
      The U.S. Department of Energy (DOE) is proposing to provide federal funding to GTI Energy (GTI) to design, fabricate, and lab test a hybrid compact…