The purpose of the proposed action is to construct and operate a new 11,360 ft2, single-story Security Support Building at the Advanced Test Reacto…
Idaho National Laboratory (INL) lacks enough office space at the Research and Education Campus (REC) in Idaho Falls to accommodate a growing work f…
The purpose of this revision is to cover ground preparation activities for Pad A that were overlooked in the original EC. The ground will need to b…
Purchase, install, and operate a new aboveground diesel fuel storage tank for the emergency backup air compressor located at the Idaho Nuclear Tech…
Idaho National Laboratory (INL) assists the Nation's ability to defend against cyber threats to our critical infrastructure. …
The 180 kW emergency diesel generator for the Fuels and Applied Science Building (FASB) at the Materials and Fuels Complex (MFC) building MFC-787 n…
This revision identifies a change in the landing location and the number of landings. The new location is in the Critical Infrastructure Test Range…
The purpose of this revision is to capture additional project scope. The repaving project required a temporary turn-around location to accommodate …
The Fuel Cycle Research and Development (FCRD) program aims to recycle used nuclear fuel and reduce the time-scale for managing high-level nuclear …
N&HS requires additional field office space in the CITRC area for use by multiple programs. The trailer will supply valuable square footage for tra…