The purpose is to provide additional office space to accommodate the projected increase in NRF personnel over the next 10 years.
This revision adds scope to revision 1 of the environmental checklist (EC). Power Management has identified additional power poles that need to be …
The purpose of this overarching EC is to address activities through FY 2020 that would meet the intent of the Categorical Exclusion (CX) B1.3 as de…
The Air Drop Mission Planner System is an aircraft tool in the aircraft that calculates an acceptable cargo release point when given a desired land…
The purpose of the proposed action is to construct and operate a new 11,360 ft2, single-story Security Support Building at the Advanced Test Reacto…
Idaho National Laboratory (INL) lacks enough office space at the Research and Education Campus (REC) in Idaho Falls to accommodate a growing work f…
The purpose of this revision is to cover ground preparation activities for Pad A that were overlooked in the original EC. The ground will need to b…
Purchase, install, and operate a new aboveground diesel fuel storage tank for the emergency backup air compressor located at the Idaho Nuclear Tech…
Idaho National Laboratory (INL) assists the Nation's ability to defend against cyber threats to our critical infrastructure. …
The 180 kW emergency diesel generator for the Fuels and Applied Science Building (FASB) at the Materials and Fuels Complex (MFC) building MFC-787 n…