The proposed action plans, prepares, coordinates, ships materials off-site, observes, and completes radiological response training at Idaho Nationa…
The purpose of this revision is to add the replacement of the TAN-679 roof. The environmental aspects and conditions and instructions remain the sa…
Revision 1: The purpose of this revision is to add leasing furnished office space in Constitutional Plaza at 357 Constitution Way in Idaho Falls. T…
This revision adds new poles at CITRC on circuit 54. Poles will be: 54-26A-1, 54-9-4-3 and 54-9-4-4.…
The proposed National Science Foundation (NSF)-funded study between Boston University and Washington State University examines coherent atmospheric…
The proposed action relocates Idaho National Laboratory (INL) Personal Property Excess Services from the Central Facilities Area (CFA) to the Idaho…
The purpose is to provide additional office space to accommodate the projected increase in NRF personnel over the next 10 years.
This revision adds scope to revision 1 of the environmental checklist (EC). Power Management has identified additional power poles that need to be …
The purpose of this overarching EC is to address activities through FY 2020 that would meet the intent of the Categorical Exclusion (CX) B1.3 as de…
The Air Drop Mission Planner System is an aircraft tool in the aircraft that calculates an acceptable cargo release point when given a desired land…