CX-020070: SMC Parking Lot Repaving

The purpose of this revision is to capture additional project scope. The repaving project required a temporary turn-around location to accommodate …

Office of NEPA Policy and Compliance

June 3, 2019
minute read time

The purpose of this revision is to capture additional project scope. The repaving project required a temporary turn-around location to accommodate bus traffic during lot repaving.