INL - Idaho Completion Project Environmental and Regulatory Services Activities CX(s) Applied: B3.1Date: 06/02/2014 Location(s): IdahoOffices(s): Nuclear Energy
Swan Valley-Teton Overhead Fiber Line Install CX(s) Applied: B4.6 Date: 06/02/2014 Location(s): Idaho Offices(s): Bonneville Power Administration
Boride Based Electrode Materials with Enhanced Stability under Extreme Conditions for MHD Direct Power CX(s) Applied: B3.6 Date: 05/30/2014 Location(s): Idaho Offices(s): National Energy Technology Laboratory
Boride Based Electrode Materials with Enhanced Stability under Extreme Conditions for MHD Direct Power CX(s) Applied: B3.6 Date: 05/30/2014 Location(s): Idaho Offices(s): National Energy Technology Laboratory
Shelley-New Sweden Parking Lot Flood Control CX(s) Applied: B2.5 Date: 05/22/2014 Location(s): Idaho Offices(s): Nuclear Energy
Advanced Test Reactor (ATR) Complex Camera Tower Installation CX(s) Applied: B2.2 Date: 05/22/2014 Location(s): Idaho Offices(s): Nuclear Energy
Irradiated Materials Characterization Laboratory (IMCL) Equipment Installation Project CX(s) Applied: B1.31 Date: 05/21/2014 Location(s): Idaho Offices(s): Nuclear Energy
Hot Fuels and Examination Facility (HFEF) Documented Safety Analysis (DSA) Implementation Tasks CX(s) Applied: B2.5 Date: 05/21/2014 Location(s): Idaho Offices(s): Nuclear Energy
Relocation of Environmental Monitoring Services Personnel and Equipment CX(s) Applied: B1.31 Date: 05/20/2014 Location(s): Idaho Offices(s): Nuclear Energy
Design of SC Walls and Slabs for Impulsive Loading - Purdue University CX(s) Applied: B3.6 Date: 05/05/2014 Location(s): Idaho Offices(s): Nuclear Energy