Central Facilities Area (CFA)-623/624 Electric Heat Conversion Project CX(s) Applied: B3.9Date: 41837 Location(s): IdahoOffices(s): Nuclear Energy
Advanced Test Reactor (ATR) Electronic Message Board Installation CX(s) Applied: B1.7Date: 41830 Location(s): IdahoOffices(s): Nuclear Energy
Materials and Fuel Complex (MFC)-782 Fire Sprinkler Installation CX(s) Applied: B2.2Date: 41829 Location(s): IdahoOffices(s): Nuclear Energy
Test Reactor Area (TRA)-653 Conference Room Modifications CX(s) Applied: B1.15Date: 41829 Location(s): IdahoOffices(s): Nuclear Energy
Remote Closure Switch for Test Reactor Area (TRA)-786 Output Breaker CX(s) Applied: B2.5Date: 41827 Location(s): IdahoOffices(s): Nuclear Energy
Palisades-Swan Valley Transmission Line Rebuild CX(s) Applied: B4.13 Date: 06/30/2014 Location(s): Idaho Offices(s): Bonneville Power Administration
Advanced Test Reactor Primary Coolant Pump Motor Starters Replacement CX(s) Applied: B1.31 Date: 06/24/2014 Location(s): Idaho Offices(s): Nuclear Energy
High Performance Computing Upgrades CX(s) Applied: B1.31 Date: 06/16/2014 Location(s): Idaho Offices(s): Nuclear Energy
United States Geological Survey (USGS) Geotechnical Drilling for USGS-142 and USGS-143 CX(s) Applied: B3.1 Date: 06/16/2014 Location(s): Idaho Offices(s): Nuclear Energy
Zero Power Physics Reactor (ZPPR) Documented Safety Analysis (DSA) Implementation Project Tasks CX(s) Applied: B2.5 Date: 06/09/2014 Location(s): Idaho Offices(s): Nuclear Energy