Advanced Test Reactor Air Conditioning Upgrades CX(s) Applied: B1.4Date: 02/19/2015 Location(s): IdahoOffices(s): Nuclear Energy
Bond Strength Laser Shock Testing CX(s) Applied: B1.31Date: 02/18/2015 Location(s): IdahoOffices(s): Nuclear Energy
Ceramic Sensor Experiments in the Analytical Laboratory CX(s) Applied: B3.6Date: 02/17/2015 Location(s): IdahoOffices(s): Nuclear Energy
Installation of Emergency Eyewash/Shower Station in Room B6 of the Radiochemistry Laboratory CX(s) Applied: B2.3Date: 02/17/2015 Location(s): IdahoOffices(s): Idaho Operations Office
Spent Resin Removal and Addition of New Resin to Ion Exchange (IX) Columns Located at CPP-666 (2) CX(s) Applied: B6.3Date: 02/15/2015 Location(s): IdahoOffices(s): Nuclear Energy
Diffusion Couple Test CX(s) Applied: B3.6Date: 02/10/2015 Location(s): IdahoOffices(s): Idaho Operations Office
Critical Infrastructure Test Range Complex - National and Homeland Security Electrical Upgrades to Power Burst Facility 613 and Auxiliary Reactor Area 632 CX(s) Applied: B3.6Date: 02/05/2015 Location(s): IdahoOffices(s): Idaho Operations Office
Process Demonstration Unit Support Structure CX(s) Applied: B1.15Date: 02/04/2015 Location(s): IdahoOffices(s): Idaho Operations Office
Advanced Reactor Technologies Tristructural Isotropic Fuels - Safety Testing and Post-Irradiation Examination CX(s) Applied: B3.6Date: 01/15/2015 Location(s): IdahoOffices(s): Nuclear Energy
Spent Resin Removal and Addition of New Resin to Ion Exchange (IX) Columns Located at CPP-666 CX(s) Applied: B6.3Date: 01/07/2015 Location(s): IdahoOffices(s): Nuclear Energy