Test Reactor Area (TRA)-640 Fire Sprinkler System Modifications CX(s) Applied: B2.5 Date: 05/01/2014 Location(s): Idaho Offices(s): Nuclear Energy
Energy Systems Laboratory Process Demonstration Unit Biomass Dryer Exhaust Stack Exhaustion CX(s) Applied: B1.31 Date: 04/30/2014 Location(s): Idaho Offices(s): Nuclear Energy
Hatwai Substation Bay 4 Equipment Acquisition CX(s) Applied: B1.24 Date: 04/22/2014 Location(s): Idaho Offices(s): Bonneville Power Administration
Microgrid Demonstration Project CX(s) Applied: B5.15 Date: 03/24/2014 Location(s): Idaho Offices(s): Idaho Operations Office
Beneway Market Energy Efficiency Project CX(s) Applied: A9, B1.31 Date: 02/18/2014 Location(s): Idaho Offices(s): Golden Field Office
Wood Pole Replacements Along the Targhee Tap and Targhee-Drummond 115-kilovolt (kV) Transmission Line Rights-Of-Way CX(s) Applied: B1.3 Date: 01/29/2014 Location(s): Idaho Offices(s): Bonneville Power Administration
Enhanced Shielding Performance of High Level Waste Storage Packages via Multi-Component Coatings – Virginia Polytechnic Institute and State University CX(s) Applied: B3.6 Date: 01/22/2014 Location(s): Idaho Offices(s): Idaho Operations Office
NuScale SMR Design Development and Certification Project CX(s) Applied: B3.6 Date: 01/22/2014 Location(s): Idaho Offices(s): Idaho Operations Office
Franklin to Hatwai Fiber Project CX(s) Applied: B4.7 Date: 01/17/2014 Location(s): Washington, Washington, Washington, Idaho Offices(s): Bonneville Power Administration
Self-Consolidating Concrete Construction for Modular Units – Georgia Institute of Technology CX(s) Applied: B3.6 Date: 01/14/2014 Location(s): Idaho Offices(s): Idaho Operations Office