This revision includes three new proposed locations at the Central Facilities Area (CFA) for the potential future deployment of the Antares R1 Micr…
Bonneville Power Administration (BPA) proposes to fund the Nez Perce Tribe (NPT) to replace an agricultural ford on Sweetwater Creek with a new bri…
Bonneville Power Administration (BPA) proposes to fund the Idaho Department of Fish and Game (IDFG) to install two pre-fabricated metal sheds withi…
New RSWF capability/unit to design and install a storage pad for NRIC microreactors post-irradiation. Construction of a storage pad and necessary u…
Facility B21-615, a newly constructed building located at the Central Facilities Area (CFA) Gun Range, currently has limited access. At present, en…
The Antares R1 Mark-0 Reactor Project at Idaho National Laboratory (INL) involves deploying and operating the Antares R1 Mark-0, a small, high-temp…
Project Introduction Standard Nuclear proposes to conduct site characterization activities in support of the planned Standard Nuclear–Idaho (SN-I) …
Proposed activities include: Siting, construction, modification, operation, and decommissioning of facilities for small-scale research and developm…
The Idaho National Laboratory (INL) will design, fabricate, and test silicon carbide (SiC) fuel cladding capsules to support transient testing unde…
This document outlines the job requirements for the Environmental Review Process (ERP) concerning (4) Launch Pad temporary sign sites, the skids on…