During the construction of the Pronghorn Station, the Idaho National Laboratory (INL) will supply temporary power to facilitate the construction an…
This revision is based on Aalo further defining areas needed to perform limited construction activities. The limited construction activities will r…
BEA is performing additional Senior Seismic Hazard Analysis Committee (SSHAC) Level 1 and/or 2 on behalf of the U.S. Department of Energy (DOE). Th…
The No Trespassing signs along the Idaho National Laboratory (INL) border have not been updated for some time and have consequently become illegibl…
Bonneville Power Administration (BPA) proposes to fund the Kootenai Tribe of Idaho (KTOI) to construct a greenhouse (engineered structure) that wou…
The temporary bypass road will be moved from the West side of Taylor Blvd to the East side. This will increase the area of potential effect (APE) t…
Bonneville Power Administration (BPA) proposes to fund the Idaho Department of Fish and Game (IDFG) to install two pre-fabricated metal sheds withi…
Bonneville Power Administration (BPA) proposes to replace in-kind wood pole structures and associated structural/electrical components (e.g., cross…
Recipient will deploy the DLR technology (WireWarrior sensors) using drone and integrate DLR data into a simulated grid operations and scheduling e…
Northern Lights plans to replace approximately 50 existing wooden utility poles with ductile iron poles. A crew will remove the wooden poles while …