Bonneville Power Administration (BPA) proposes to fund the Nez Perce Tribe (NPT) to replace an agricultural ford on Sweetwater Creek with a new bri…
Bonneville Power Administration (BPA) proposes to fund the Idaho Department of Fish and Game (IDFG) to install two pre-fabricated metal sheds withi…
This revision is for Oklo to install temporary power lines to the Aurora-INL project site, install a production well at the Aurora-INL site, and utilize an MFC construction water supply source to provide water to support Aurora-INL limited construction activities.
INL Power Group will be installing a transformer to drop power from 138 kV to 13.8 kV from INL substation. Aalo will then install 14 power poles and a 480V transformer to distribute power throughout the Aalo site.
New RSWF capability/unit to design and install a storage pad for NRIC microreactors post-irradiation. Construction of a storage pad and necessary u…
Facility B21-615, a newly constructed building located at the Central Facilities Area (CFA) Gun Range, currently has limited access. At present, en…
The Antares R1 Mark-0 Reactor Project at Idaho National Laboratory (INL) involves deploying and operating the Antares R1 Mark-0, a small, high-temp…
Project Introduction Standard Nuclear proposes to conduct site characterization activities in support of the planned Standard Nuclear–Idaho (SN-I) …
Proposed activities include: Siting, construction, modification, operation, and decommissioning of facilities for small-scale research and developm…
The Idaho National Laboratory (INL) will design, fabricate, and test silicon carbide (SiC) fuel cladding capsules to support transient testing unde…