December 19, 2022
CX-028335: IF-654 (EROB) Motor Coach Charging Station Installation
This project will be a revision to the electric vehicle charging station scope identified in INL-19-159 for REC facilities. This revision will incl…
December 19, 2022
CX-028332: Unmanned Aerial System Testing
The project is seeking to create another gravel pad (50 ft. x 100 ft.). This pad will be on the east side of the runway near its center. The pad wi…
December 19, 2022
CX-028331: Transient Reactor Test (TREAT) Facility Irradiation of EBR-II High Burnup Mixed Oxide (MOX) Fuel Pins
This ECP has been revised to include the following changes to the Scope of Work (SOW)...…
December 19, 2022
CX-028315: Installation and Operation of Vitrification System in MFC-765, Fuel Conditioning Facility
The Idaho National Laboratory (INL), through the Department of Energy (DOE), is responsible for the disposition of excess material and generated wa…
December 9, 2022
CX-027293: Hangman Creek Land/Conservation Easement Exchange and Stewardship Funding
The Bonneville Power Administration (BPA) is proposing to authorize the transfer of conservation easement protection status held by BPA from upland…
December 6, 2022
CX-028349: Canadian Nuclear Laboratories Nuclear Materials demonstration with Spark Plasma Sintering
CNL is developing nuclear materials forms for waste disposition purposes and is interested in exploring Spark Plasma Sintering (SPS) as a method to…
November 15, 2022
CX-028348: Biological Persistence in the Environment
The purpose of this work is to observe the persistence of microorganisms, like the yeast strain Saccharomyces cerevisiae NE095 (Risk Group 1, RG-1)…
November 7, 2022
CX-028311: Passive Gravity and Magnetic Surveys Across Unnamed Butte at INL
As part of the INL PVHA, new data collection and analyses (NDCA) are being conducted to support development of volcanic hazard models. Airborne geo…
November 1, 2022
CX-028339: Radiological Source Disposition Program
This revision deals with the addition of project scope to construct and test a mobile hot cell (MHC) to be used in the end-of-life management of ra…
October 26, 2022
CX-027060: L-8a Settling Basin Construction
The Bohannon 03 irrigation diversion was removed in 2017 and the flood irrigation system it supplied was replaced with a pump and sprinkler system …