Phase 1: Design...Phase 2: Construction…
Lease a 4,780 sq ft of additional space for training facilities and additional storage for building maintenance through the Yellowstone Management …
The Idaho National Laboratory (INL) Wireless Test Bed (WTB) USG 121 Customer has requested the use of the INL test range, and off-site areas surrou…
N and HS personnel will be conducting 500KW generator testing over the course of the next two to three years with approximately 500 hours of operat…
It is imperative to develop standard guidelines, diagnostic methods, and tools to handle stranded energy appropriately and minimize safety risks fr…
Curio is pursuing applied research and experimental demonstrations to reduce risks and uncertainties, incorporate safeguards-by-design, and minimiz…
The U.S. Department of Energy (DOE) proposes to allocate approximately 10 Metric Tons (MT) of High-Assay Low-Enriched Uranium (HALEU) produced thro…
Power and communication lines will be fed to the building aboveground through conduit on jersey blocks, underground from an existing pole, or overh…
Prior to D and D, the INL Fire Department will use MFC-713 for a simulated building fire and subsequent training exercises.…
The purpose of the proposed action is to provide a new leased Machining and Fabrication Engineering Laboratory (MFEL) that will include office spac…