This scope covered the ground preparation, creation, construction, and installation of the sign (See Figure 2 and 3 for approximate location). It a…
This project is being pursued in efforts to support a future mission to provide a location with the infrastructure and capability to perform system…
This revision addresses the addition of a hydrogen purification and compression system to the 250 kW Solid Oxide Electrolysis Cell (SOEC) hydrogen …
Establish a set of streetlights at the intersections of Lincoln Road/INTEC entrance, and at the Lincoln Road/NRF "Y" that will provide sufficient i…
INL will provide a detailed characterization of warfighter waste, of both composition and quantity generated based on information obtained from the…
This project scope describes the install of a new distribution water line extension from CFA to the INL Live Fire Range to supply the new Consolida…
Phase 1: Design...Phase 2: Construction…
Lease a 4,780 sq ft of additional space for training facilities and additional storage for building maintenance through the Yellowstone Management …
The Idaho National Laboratory (INL) Wireless Test Bed (WTB) USG 121 Customer has requested the use of the INL test range, and off-site areas surrou…
N and HS personnel will be conducting 500KW generator testing over the course of the next two to three years with approximately 500 hours of operat…