This funding will address the layout of the existing warehouse dock and other site concerns, such as drainage. It will create a more functional app…
The objective of this PTS is to establish an agreement for INL to prepare and provide to ORNL/TRISO-X HEU and HALEU fuel material for the Westingho…
MFC plans to create bird nesting structures for both barn and cliff swallows to help further avoid potential conflicts between operations, personne…
The RCB building or support systems to the laboratory may be modified to support on-going needs of staff or research projects.…
Currently, the next generation of MSR designs are theoretical and there exists a large knowledge gap on the behavior of multi-component salt system…
Idaho National Laboratory (INL) has been identified by Liteye as the ideal location to provide counter Unmanned Aircraft Systems (cUAS) systems tes…
The Modular Office Building T-13 (MFC-713) will be demolished and disposed (D and D) in the Spring/Summer of 2023 in preparation for utility realig…
Revision 4: New locations…
This scope covered the ground preparation, creation, construction, and installation of the sign (See Figure 2 and 3 for approximate location). It a…
This project is being pursued in efforts to support a future mission to provide a location with the infrastructure and capability to perform system…