This project is to change out two (2) poles and re-framing three (3) additional poles. The poles that need to changed out where discovered during o…
This project is to convert all the overhead lines to underground. This would include the primary lines and the secondary lines, this will not inclu…
This project start at Dixie Ave and Miller Blvd in Fruitland Park, FL. The reconductor will start at this intersection and go north to Spring Lake…
From US 27 and Carpenter St. starting at pole 209683, we are installing a new pole and installing our primary lines underground southwest to South …
The installation, modification, operation, and removal of electric vehicle charging stations, using commercially available technology, within a pre…
The installation, modification, operation, and removal of electric vehicle charging stations, using commercially available technology, within a pre…
Replace existing copper overhead conductors with No. 2 Aluminum Conductor, Steel Reinforced (ACSR) within the CEC territory in Clay County, FL. Add…
Eagle LNG Partners Jacksonville II LLC (Eagle Maxville) filed an application (Amendment Application) with the Office of Fossil Energy and Carbon Management (FECM) on April 30, 2025, pursuant to section 3 of the Natural Gas Act (NGA) and 10 CFR Part 590 of the Department of Energy's (DOE) regulations.
The project will convert 26kV Lateral Overhead Distribution to 26kV Underground Electrical Services. The overhead electrical conductors will be rem…
This is a targeted, reliability and resiliency improvement driven project at the Leesburg Electric North Substation for the replacement of an out o…