The installation, modification, operation, and removal of electric vehicle charging stations, using commercially available technology, within a pre…
Replace existing copper overhead conductors with No. 2 Aluminum Conductor, Steel Reinforced (ACSR) within the CEC territory in Clay County, FL. Add…
Eagle LNG Partners Jacksonville II LLC (Eagle Maxville) filed an application (Amendment Application) with the Office of Fossil Energy and Carbon Management (FECM) on April 30, 2025, pursuant to section 3 of the Natural Gas Act (NGA) and 10 CFR Part 590 of the Department of Energy's (DOE) regulations.
The project will convert 26kV Lateral Overhead Distribution to 26kV Underground Electrical Services. The overhead electrical conductors will be rem…
This is a targeted, reliability and resiliency improvement driven project at the Leesburg Electric North Substation for the replacement of an out o…
This is a targeted, reliability improvement driven project in the City of Fruitland Park. This project will improve resiliency and reliability by i…
After a thorough reliability performance review of all our circuits and the impacts of storms to our grid, we have prioritized areas for improvemen…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to T2C-Energy LLC (T2C) to design, fabricate, install, and operate a de…
The U.S. Department of Energy (DOE) is proposing to administer Congressionally Directed Spending to the City of Clearwater (Clearwater) to design a…
CX-033666: Establish Preventive and Predictive Maintenance to Enhance Grid Resilience in Fort Pierce
This project will involve the installation of 408 fault indicators and 18 automatic switches across 34 distribution feeders within the Fort Pierce …