Flooding into NM3 and 4 building was discovered in July. Investigation revealed a domestic water leak from a cross pipe running between NS2 and NM5…
On June 8, 2025, the Fermilab Fire Department (FFD) was dispatched to Lab A for an Automatic Fire Alarm (AFA).
Flooding into NM3 and 4 building was discovered in July. Investigation revealed a domestic water leak from a cross pipe running between NS2 and NM5.
Due to severe weather, there was a downed power line on Eola Rd that needed to be repaired. There was no alternative available, because several sit…
Due to severe weather, there was a downed power line on Eola Rd that needed to be repaired.
This review is supplemental documentation to the existing and approved PIP II Environmental Assessment (EA) ID No. DOE/EA-2072 and Finding of No Significant Impact (FONSI).
The purpose of the demolition of Site 50, 52, and 55 houses at Fermi National Accelerator Laboratory (Fermilab) in Batavia, IL, is to reduce excess…
The purpose of the Fermi National Accelerator Laboratory (Fermilab) Ecological Land management (ELM) Plan is to enhance the environment and communi…
The purpose of this plan is to implement a structured, phased approach to the safe and efficient disposal of scrap materials and waste stored at th…
The purpose of the Fermi National Accelerator Laboratory (Fermilab) Environmental Monitoring Program is to assist Fermilab management in decision-m…