Lease of the Cabin Portion of Building 12, Grand Junction, Colorado, Site CX(s) Applied: B1.24, B1.25Date: 09/14/2015 Location(s): ColoradoOffices(s): Legacy Management
Resilient DC Microgrid Solution for REDI CX(s) Applied: A1, A9, B1.7, B4.4Date: 09/14/2015 Location(s): ColoradoOffices(s): National Energy Technology Laboratory
NREL – FTLB Room 269 Fuel Synthesis Lab: NREL Tracking No. 15-032 Award Number: DE-AC36-08GO28308 CX(s) Applied: DOE/EA-1968 National Renewable Energy Laboratory (NREL) Date: 09/10/2015 Location(s): CO Office(s): Golden Field Office
Offshore Storage Resource Assessment CX(s) Applied: A9Date: 09/08/2015 Location(s): ColoradoOffices(s): National Energy Technology Laboratory
Ion Advanced Solvent Carbon Dioxide Capture Pilot Project CX(s) Applied: B3.6Date: 09/08/2015 Location(s): ColoradoOffices(s): National Energy Technology Laboratory
Predictive Solar-Integrated Commercial Building Load Control Award Number: DE-EE0007180 CX(s) Applied: A9, B3.6, B5.15 Solar Energy Technologies Office Date: 09/04/2015 Location(s): CO Office(s): Golden Field Office
STM FTLB Landscaping Project; NREL Tracking No. 15-031 Award Number: DE-AC36-08GO28308 CX(s) Applied: DOE/EA-1968 National Renewable Energy Laboratory (NREL) Date: 09/02/2015 Location(s): CO Office(s): Golden Field Office
PACE: Producing Algae for Co-products and Energy Award Number: DE-EE0007089 CX(s) Applied: A9, B3.6 Bioenergy Technologies Office Date: 08/31/2015 Location(s): CO Office(s): Golden Field Office
Advanced Trough with Lower-cost System-architecture (ATLAS) Award Number: DE-EE0007121 CX(s) Applied: A9, B3.6, B5.17 Solar Energy Technologies Office Date: 08/31/2015 Location(s): CO Office(s): Golden Field Office
Reconciling Basin-Scale Top-Down and Bottom-Up Methane Emission Measurements... CX(s) Applied: A9, B3.1Date: 08/27/2015 Location(s): ColoradoOffices(s): National Energy Technology Laboratory