Bonneville Power Administration (BPA) is proposing to resurface the bridge crossing of Butte Creek, which leads to BPA’s Raymond Substation. The br…
BPA proposes to replace 16 structures and improve access roads on the Fairview-Bandon No. 1, Reedsport-Fairview No. 1, Tahkenitch-Reedsport No. 1, …
BPA is proposing to perform routine road maintenance to approximately 2.69 linear miles of existing access road for the Grand Coulee – Chief Joseph…
Bonneville Power Administration (BPA) is proposing to allow Comcast to remove and replace 128 feet of existing above ground strand and coaxial cabl…
Bonneville Power Administration (BPA) proposes to upgrade its VHF mobile radio system at BPA communication sites throughout its Mobile Radio Essent…
Bonneville Power Administration (BPA) proposes to perform routine road maintenance, repair, and improvements on approximately 1,650 linear feet of …
BPA proposes to replace deteriorating wood pole structures and associated structural/electrical components (e.g. cross arms, insulators, guy anchor…
BPA proposes to replace deteriorating wood pole structures and associated structural/electrical components (e.g. cross arms, insulators, guy anchor…
The Bonneville Power Administration (BPA) proposes to correct two areas along the St. Clair-South Tacoma transmission line where the ground to cond…
BPA is in the scoping process for a new radio station tentatively named “Butte” Radio Station, to be located about 4.5 miles east of downtown Butte…