Bonneville Power Administration (BPA) proposes to acquire additional right-of-way (ROW) easement along the Brasada-Harney-No. 1 transmission line t…
A survey of the 500kV Monroe-Custer No. 1 transmission line resulted in the identification of a Snohomish County PUD (SCPUD) distribution line that…
BPA proposes to remove the outdated control house at Maupin Substation to accommodate additional equipment to meet future needs. Equipment used to …
BPA proposes to sell Norway Substation to Coos-Curry Electrical Cooperative. The property is comprised of 1.32 acres of BPA fee-owned land. CoosCur…
BPA proposes to provide funding to the Yakima Klickitat Fisheries Program (YKFP) to implement improvements to a raceway at the Jack Creek Acclimati…
Bonneville Power Administration (BPA) proposes to allow T-Mobile to modify the existing wireless facilities located on transmission line structures…
The Bonneville Power Administration proposes to allow Puget Sound Energy to install a steel pole and run double circuit 230kV transmission lines fr…
The Bonneville Power Administration (BPA) is proposing to replace cross-arms on 13 wood pole structures along the Grand Coulee-Okanagan No. 2 trans…
BPA proposes to replace deteriorating wood poles and associated structural/electrical components (e.g., cross arms, insulators, guy anchors, etc.)…
The Bonneville Power Administration (BPA) proposes to install a new Power Control Assembly (PCA) building and to remove the existing control house …