BPA proposes to remove the outdated control house at Maupin Substation to accommodate additional equipment to meet future needs. Equipment used to …
BPA proposes to sell Norway Substation to Coos-Curry Electrical Cooperative. The property is comprised of 1.32 acres of BPA fee-owned land. CoosCur…
BPA proposes to provide funding to the Yakima Klickitat Fisheries Program (YKFP) to implement improvements to a raceway at the Jack Creek Acclimati…
Bonneville Power Administration (BPA) proposes to allow T-Mobile to modify the existing wireless facilities located on transmission line structures…
The Bonneville Power Administration proposes to allow Puget Sound Energy to install a steel pole and run double circuit 230kV transmission lines fr…
BPA proposes to replace deteriorating wood poles and associated structural/electrical components (e.g., cross arms, insulators, guy anchors, etc.)…
The Bonneville Power Administration (BPA) is proposing to replace cross-arms on 13 wood pole structures along the Grand Coulee-Okanagan No. 2 trans…
The Bonneville Power Administration (BPA) proposes to install a new Power Control Assembly (PCA) building and to remove the existing control house …
Bonneville Power Administration proposes to fund the Confederated Tribe of Warm Springs, as part of the Columbia Basin Fish Accords, to perform rou…
The Bonneville Power Administration (BPA) is proposing to perform urgent work on the Sammamish-Maple Valley #1 230kV transmission line between stru…