Optimization Project #3 CX(s) Applied: B2.5, B5.2, B5.4, B5.5 Date: 07/26/2013 Location(s): Wyoming Offices(s): RMOTC
Optimization Project Area #1 CX(s) Applied: B2.5, B5.2, B5.4, B5.5 Date: 07/26/2013 Location(s): Wyoming Offices(s): RMOTC
Optimization Project Area #2 CX(s) Applied: B2.5, B5.2, B5.4, B5.5 Date: 06/28/2013 Location(s): Wyoming Offices(s): RMOTC
Easts Ide Renovation Project Zone 1-Revision (T-1-11) CX(s) Applied: B2.5, B5.2, B5.4, B5.5 Date: 03/13/2014 Location(s): Wyoming Offices(s): RMOTC
Easts Ide Renovation Project Zone 1-Revision (T-1-11) CX(s) Applied: B2.5, B5.2, B5.4, B5.5 Date: 03/13/2014 Location(s): Wyoming Offices(s): RMOTC
Strategic Petroleum Reserve Emergency Pipeline and Piping Repair, 2013-2017 CX(s) Applied: B5.4 Date: 10/30/2012 Location(s): CX: none Offices(s): Strategic Petroleum Reserve Field Office
Buried Flow Line from 32-A-34 to 34-AX-34 CX(s) Applied: B2.5, B5.2, B5.4 Date: 07/17/2012 Location(s): Wyoming Offices(s): RMOTC
Buried Flow Line from T-2-34 to T-1-33 CX(s) Applied: B2.5, B5.2, B5.4 Date: 06/27/2012 Location(s): Wyoming Offices(s): RMOTC
Black Hills State Heating and Cooling Plant CX(s) Applied: B1.15, B1.23, B2.2, B5.1, B5.2, B5.4 Date: 06/13/2012 Location(s): South Dakota Offices(s): National Energy Technology Laboratory
High Pressure Fire Loop and Lead-In Replacement in the MAA - Amendment 01 CX(s) Applied: B5.4 Date: 05/29/2012 Location(s): Texas Offices(s): Pantex Site Office