Replace Section of 36-inch Crude Oil Pipeline at Hillebrandt Bayou CX(s) Applied: B5.4Date: 42534 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Pump Station Improvements (Transcontinental) Award Number: DE-EE0006212 CX(s) Applied: B5.1, B5.4 Weatherization & Intergovernmental Programs Office Date: 07/10/2014 Location(s): LA Office(s): Golden Field Office
MSA Annual Categorical Exclusion for Repair or Replacement of Pipelines CX(s) Applied: B5.4Date: 12/31/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
Direct Assessment and Repair of BH-SUN 36-inch Crude Oil Pipeline CX(s) Applied: B5.4Date: 41869 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Repair Corroded Flow Line Near 33-SX-11 CX(s) Applied: B5.4, B5.6 Date: 12/30/2013 Location(s): Wyoming Offices(s): RMOTC
Optimization Project #3 CX(s) Applied: B2.5, B5.2, B5.4, B5.5 Date: 07/26/2013 Location(s): Wyoming Offices(s): RMOTC
Optimization Project Area #1 CX(s) Applied: B2.5, B5.2, B5.4, B5.5 Date: 07/26/2013 Location(s): Wyoming Offices(s): RMOTC
Optimization Project Area #2 CX(s) Applied: B2.5, B5.2, B5.4, B5.5 Date: 06/28/2013 Location(s): Wyoming Offices(s): RMOTC
Easts Ide Renovation Project Zone 1-Revision (T-1-11) CX(s) Applied: B2.5, B5.2, B5.4, B5.5 Date: 03/13/2014 Location(s): Wyoming Offices(s): RMOTC
Easts Ide Renovation Project Zone 1-Revision (T-1-11) CX(s) Applied: B2.5, B5.2, B5.4, B5.5 Date: 03/13/2014 Location(s): Wyoming Offices(s): RMOTC