Optimization Project Area #2 CX(s) Applied: B2.5, B5.2, B5.4, B5.5 Date: 06/28/2013 Location(s): Wyoming Offices(s): RMOTC
Replace Obsolete West Hackberry Raw Water Injection Pump Vibration Transmitters CX(s) Applied: B5.2 Date: 06/24/2013 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Easts Ide Renovation Project Zone 1-Revision (T-1-11) CX(s) Applied: B2.5, B5.2, B5.4, B5.5 Date: 03/13/2014 Location(s): Wyoming Offices(s): RMOTC
Easts Ide Renovation Project Zone 1-Revision (T-1-11) CX(s) Applied: B2.5, B5.2, B5.4, B5.5 Date: 03/13/2014 Location(s): Wyoming Offices(s): RMOTC
American Recovery and Reinvestment Act Energized Missouri Water Loan Project at City of Maryville CX(s) Applied: B5.1, B5.2 Date: 12/13/2012 Location(s): Missouri Offices(s): Golden Field Office
Install Temperature Monitoring on Big Hill 36 inch Crude Oil Pipeline CX(s) Applied: B5.2 Date: 11/26/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Brigham City Hydro Generation Project CX(s) Applied: B1.8, B5.2 Date: 11/08/2012 Location(s): Utah Offices(s): Golden Field Office
Alternate Source of Firewater at Bryan Mound CX(s) Applied: B5.2 Date: 11/05/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Buried Flow Line from 32-A-34 to 34-AX-34 CX(s) Applied: B2.5, B5.2, B5.4 Date: 07/17/2012 Location(s): Wyoming Offices(s): RMOTC
Buried Flow Line from T-2-34 to T-1-33 CX(s) Applied: B2.5, B5.2, B5.4 Date: 06/27/2012 Location(s): Wyoming Offices(s): RMOTC