Design and Implementation of Geothermal Energy Systems at West Chester University - 1CX(s) Applied: A9, B5.1, B5.2Date: 02/28/2011Location(s): PennsylvaniaOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
Dig ditch from 24-51-STX-1 0 to 24-AX-10 and reinstall electrical wireCX(s) Applied: B1.3, B5.2Date: 01/13/2011Location(s): Casper, WyomingOffice(s): RMOTC
T-2-33CX(s) Applied: B1.22, B1.28, B1.30, B5.2, B6.1Date: 01/03/2011Location(s): Casper, WyomingOffice(s): RMOTC
T-1-27 RestorationCX(s) Applied: B1.22, B1.23, B1.28, B1.30, B5.2, B6.1Date: 01/03/2011Location(s): Casper, WyomingOffice(s): RMOTC
Advanced Formation Evaluation ToolsCX(s) Applied: B3.1, B3.11, B5.2, B5.12Date: 12/10/2010Location(s): Casper, WyomingOffice(s): RMOTC
Cementing Swivel TestCX(s) Applied: B5.2Date: 12/02/2010Location(s): Casper, WyomingOffice(s): RMOTC
Universal GeoPower LLC Recovery Act: Technical Demonstration and Economic Validation of Geothermally-Produced Electricity from Coproduced Water at Existing Oil/Gas Wells in TexasCX(s) Applied: A9, B5.1, B5.2, B5.12Date: 11/19/2010Location(s): New Mexic...
Oklahoma-Tribe-Kickapoo Tribe of OklahomaCX(s) Applied: A9, B2.5, B5.2Date: 11/03/2010Location(s): OklahomaOffice(s): Energy Efficiency and Renewable Energy
Energy Efficient EnginesCX(s) Applied: A7, B1.31, B5.2Date: 08/27/2010Location(s): Racine, WisconsinOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
Viscosity ReductionCX(s) Applied: B3.11, B5.1, B5.2Date: 12/01/2010Location(s): Casper, WyomingOffice(s): RMOTC