Replace Obsolete West Hackberry Raw Water Injection Pump Vibration Transmitters Government Furnished Equipment CX(s) Applied: B5.2 Date: 09/17/2013 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Biofuels Retail Availability Improvement Network CX(s) Applied: B5.2, B5.22 Date: 08/27/2013 Location(s): Wisconsin Offices(s): National Energy Technology Laboratory
Biofuels Retail Availability Improvement Network CX(s) Applied: B5.2, B5.22 Date: 08/27/2013 Location(s): Wisconsin Offices(s): National Energy Technology Laboratory
Biofuels Retail Availability Improvement Network CX(s) Applied: B5.2, B5.22 Date: 08/27/2013 Location(s): Wisconsin Offices(s): National Energy Technology Laboratory
Biofuels Retail Availability Improvement Network CX(s) Applied: B5.2, B5.22 Date: 08/27/2013 Location(s): Wisconsin Offices(s): National Energy Technology Laboratory
Optimization Project #3 CX(s) Applied: B2.5, B5.2, B5.4, B5.5 Date: 07/26/2013 Location(s): Wyoming Offices(s): RMOTC
Optimization Project Area #1 CX(s) Applied: B2.5, B5.2, B5.4, B5.5 Date: 07/26/2013 Location(s): Wyoming Offices(s): RMOTC
Reconfiguration Of Export Water System at 181-D under Project L-781 CX(s) Applied: B5.2 Date: 07/22/2013 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Replace West Hackberry Brine Disposal System Header from MOV-51’s to WHT-14/15 Brine Tanks with HDPE Pipe CX(s) Applied: B5.2 Date: 07/03/2013 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Bryan Mound Brine Disposal Pump Replacement CX(s) Applied: B5.2 Date: 07/03/2013 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office