P41 Caustic Pump and Piping Electrical Heat Tracing and Freeze Protection…
A method of venting the pumps between the suction side of the pump and the back pressure regulator will be installed.…
Hanford Mission Integration Solutions (HMIS) and their subcontractors perform modifications to existing pump and piping configurations (including, …
The U.S. Department of Energy (DOE) is proposing to provide federal funding to ICE Thermal Harvesting, LLC (ICE) to demonstrate the ability of a he…
The U.S. Department of Energy (DOE) is proposing to provide funding to Geothermix, LLC. to fabricate, lab test, install, field test and demonstrate…
The purpose of the Knolls Laboratory Steam and Condensate Upgrade Project (Project) is to replace significant portions of the existing steam and condensate distribution system that are beyond their useful service life, vulnerable to service disruptions an
National Nuclear Security Administration (NNSA)’s proposed action is to de-inventory, deactivate, decommission, and perform limited pre-demolition …
National Nuclear Security Administration (NNSA)’s proposed action is to 1) create temporary housing for occupancy 2) provide non-occupancy space fo…
National Nuclear Security Administration’s proposed action is to perform the necessary and routine analytical laboratory operation, research and de…
National Nuclear Security Administration’s (NNSA) proposed action is to perform the necessary and routine administrative actions, training exercise…