LM is proposing to conduct aerial remote-sensing surveys at the Rocky Flats Site, Colorado and Rocky Flats National Wildlife Reguge to facilitate l…
The purpose of the Modular Office Building (MOB) Project is to install a temporary office facility for a period of about six years to provide necessary turnaround space for other site facility renovations.
Administrative and project management activities, computer modeling and analysis
National Nuclear Security Administration (NNSA)’s proposed action is to perform site characterization and routine environmental monitoring activiti…
Denbury will be injecting CO2; this award will conduct various monitoring.…
The disposal site would continue to be visually inspected on an annual basis.Monitoring includes surveying to generate and maintain spatially accurate data. Monitoring also includes inspecting or exchanging radiological monitoring devices…
Three soil borings will be strategically advanced to a depth of 240 feet at the M-Area Hazardous Waste Management Facility: Western Sector In-Situ…
Install four (4) monitoring wells and ten (10) soil borings in D-Area.…
Install flow meter, solar panel with grounding rod, sampler, and sensor in stream at FM-H1.…
The first step in the dismantlement process is to isolate the six recovery wells (i.e., RWM-12, RWM-13B, RWM-13C, RWM-14B, RWM-14C, and RWM-15B) th…