The recipient will achieve the objectives stated in Section I.C. of DE-FOA-0002364 Amendment 0003. This includes sampling, basin resource assessme…
Electrical panel doors and electrical boxes in 483-3D are covered with paint that has suspected PCBs and/or Lead.…
The recipient will achieve the objectives stated in Section I.C. of DE-FOA-0002364 Amendment 0003. This includes sampling, basin resource assessme…
Achieve the objectives stated in Section I.C. of DE-FOA-0002364 Amendment 0003. Address aspects of carbon ore, rare earth element, and critical min…
Drill a test well for data acquisition and continued characterization.…
Methane measuring-both direct and airborne monitoring-will be conducted at multiple wellsite locations throughout different oil and gas producing r…
Methane measuring-both direct and airborne monitoring-will be conducted at multiple wellsite locations throughout different oil and gas producing r…
This project includes installation of fencing and underground utilities to establish the proper security controls.
Task 10 of the Project SOPO - Field Laboratory Horizontal Well will be drilled and completed. This is a science well for the project. Location is 8…
DOE LM is proposing to conduct aerial surveys by small unmanned aircraft systems at the Lakeview, Oregon, Uranium Mill Tailings Radiation Control A…