The disposal site would continue to be visually inspected on an annual basis.Monitoring includes surveying to generate and maintain spatially accurate data. Monitoring also includes inspecting or exchanging radiological monitoring devices…
Three soil borings will be strategically advanced to a depth of 240 feet at the M-Area Hazardous Waste Management Facility: Western Sector In-Situ…
Install four (4) monitoring wells and ten (10) soil borings in D-Area.…
Install flow meter, solar panel with grounding rod, sampler, and sensor in stream at FM-H1.…
The first step in the dismantlement process is to isolate the six recovery wells (i.e., RWM-12, RWM-13B, RWM-13C, RWM-14B, RWM-14C, and RWM-15B) th…
The disposal site would continue to be visually inspected on an annual basis…
The U.S. Department of Energy (DOE) administers the Weatherization Assistance Program (WAP) as authorized by Title IV, Energy Conservation and Prod…
Recipient will be expanding current drone capabilities of identifying utility lines and damage to include vegetation in line right-of-way that may p…
To complete Design Development, the Environmental Information Volume (EIV), the investment case, and a FEED study to redevelop the existing WVR's C…
Conduct 3D seismic survey along existing public roads and agricultural lands in East Central Illinois (McLean County and Ford County).…