The proposed action includes two phases. In Phase I, we will collect a geotechnical boring. This involves a specialized drill rig that drills a hol…
The South Carolina Department of Transportation (SCDOT) will replace the existing bridge on State Road 66 (Rocky Point Road) over Lower Three Runs …
Administrative and project management activities, computer modeling and analysis
Under Task 2-Technical Challenges, collection of surface reflection seismic. Seismic acquisition will occur in Shelby Cty, AL (nearest town is West…
Administrative and project management activities, computer modeling and analysis
The proposed parking lot changes would provide more employee parking stalls, create a heavy equipment staging area, a contractor vehicle queue for …
LM proposes to conduct routine inspections, maintenance, and monitoring activities at the Bluewater, New Mexico, UMTRCA Title II, Disposal Site.…
Perform aerial surveys that would be conducted by small unmanned aircraft systems (sUAS) at the Maybell West, Colorado, Disposal Site.…
The U.S. Geological Survey (USGS) needs geologic, stratigraphic, and hydraulic data for the purpose of characterizing groundwater flow and water qu…
LM proposes to maintain ongoing facility use operations by LM and stakeholders performing routine inspections, site visits and tours, and routine m…