Install four (4) monitoring wells and ten (10) soil borings in D-Area.…
Install flow meter, solar panel with grounding rod, sampler, and sensor in stream at FM-H1.…
The first step in the dismantlement process is to isolate the six recovery wells (i.e., RWM-12, RWM-13B, RWM-13C, RWM-14B, RWM-14C, and RWM-15B) th…
The disposal site would continue to be visually inspected on an annual basis…
The U.S. Department of Energy (DOE) administers the Weatherization Assistance Program (WAP) as authorized by Title IV, Energy Conservation and Prod…
Recipient will be expanding current drone capabilities of identifying utility lines and damage to include vegetation in line right-of-way that may p…
To complete Design Development, the Environmental Information Volume (EIV), the investment case, and a FEED study to redevelop the existing WVR's C…
Conduct 3D seismic survey along existing public roads and agricultural lands in East Central Illinois (McLean County and Ford County).…
Seismic surveying to support characterization of geology and analysis of potential carbon injection operations. …
This activity includes the sampling and processing of water in cooling towers and heat injection systems at Savannah River Site for the presence of…