234-H Stack Collection Unit CX(s) Applied: B2.2 Date: 10/16/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Safety, Health, and Environmental Improvements for FY2014 and FY2015 CX(s) Applied: B2.1, B2.2, B2.3, B2.5 Date: 09/26/2013 Location(s): Texas Offices(s): Pantex Site Office
B-922 Sprinkler System Replacement CX(s) Applied: B1.15, B2.2, B2.5 Date: 09/25/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Building-922 West Office Renovation: 2nd Floor CX(s) Applied: B1.15, B2.2, B2.5 Date: 09/16/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Replace Potable Water Supply Lines: Phase Two CX(s) Applied: B1.3, B1.16, B1.32, B2.2 Date: 09/16/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Utility Metering Installation For: B6, B7, B8, B12, B14, B17, B19, B22A and B26 CX(s) Applied: B2.2 Date: 08/27/2013 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Industrial Scale Demonstration of Smart Manufacturing Achieving Transformational Energy Productivity Gains CX(s) Applied: A9, B2.2, B2.5 Date: 08/15/2013 Location(s): Texas Offices(s): Golden Field Office
University Boulevard Water Meter Installation CX(s) Applied: B2.2 Date: 08/14/2013 Location(s): Idaho Offices(s): Nuclear Energy
Building 58 Third Floor Mezzanine Enclosure CX(s) Applied: B2.1, B2.2, B2.3 Date: 07/25/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Advanced Test Reactor (ATR) Primary Coolant Leak Rate Determination System Equipment Replacement CX(s) Applied: B2.2 Date: 07/24/2013 Location(s): Idaho Offices(s): Nuclear Energy