Categorical Exclusion Determinations: B2.2

Construction and Maintenance Activities at Existing Field Offices and Operation Centers CX(s) Applied: B1.3, B1.4, B1.11, B1.16, B1.17, B1.27, B1.31, B1.33, B1.34, B2.2, B2.3, B2.5, B4.7, B5.1, B5.16, B5.17, B5.23 Date: 10/17/2013 Location(s): CX: non...
Safety, Health, and Environmental Improvements for FY2014 and FY2015 CX(s) Applied: B2.1, B2.2, B2.3, B2.5 Date: 09/26/2013 Location(s): Texas Offices(s): Pantex Site Office
Building-922 West Office Renovation: 2nd Floor CX(s) Applied: B1.15, B2.2, B2.5 Date: 09/16/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Replace Potable Water Supply Lines: Phase Two CX(s) Applied: B1.3, B1.16, B1.32, B2.2 Date: 09/16/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Utility Metering Installation For: B6, B7, B8, B12, B14, B17, B19, B22A and B26 CX(s) Applied: B2.2 Date: 08/27/2013 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Industrial Scale Demonstration of Smart Manufacturing Achieving Transformational Energy Productivity Gains CX(s) Applied: A9, B2.2, B2.5 Date: 08/15/2013 Location(s): Texas Offices(s): Golden Field Office