Categorical Exclusion Determinations: B2.2

Building-922 West Office Renovation: 2nd Floor CX(s) Applied: B1.15, B2.2, B2.5 Date: 09/16/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Replace Potable Water Supply Lines: Phase Two CX(s) Applied: B1.3, B1.16, B1.32, B2.2 Date: 09/16/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Utility Metering Installation For: B6, B7, B8, B12, B14, B17, B19, B22A and B26 CX(s) Applied: B2.2 Date: 08/27/2013 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Industrial Scale Demonstration of Smart Manufacturing Achieving Transformational Energy Productivity Gains CX(s) Applied: A9, B2.2, B2.5 Date: 08/15/2013 Location(s): Texas Offices(s): Golden Field Office
Advanced Test Reactor (ATR) Primary Coolant Leak Rate Determination System Equipment Replacement CX(s) Applied: B2.2 Date: 07/24/2013 Location(s): Idaho Offices(s): Nuclear Energy
Alaska Wind Energy Research Project (formally "St. Paul Wind Technology Development Project, Phase 2") CX(s) Applied: A9, B2.2, B3.1 Date: 07/03/2013 Location(s): Alaska Offices(s): Golden Field Office