Categorical Exclusion Determinations: B1.31

Chrysler Group LLC, Revised Specific Project Application 2, Retooling, Reequipping and EngineeringCX(s) Applied: B1.31, B5.1Date: 09/06/2011Location(s): Auburn Hills, MichiganOffice(s): Advanced Technology Vehicles Manufacturing Loan Program, Loan Guar...
B83 1st Floor Renovation - Phase II CompletionCX(s) Applied: B1.29, B1.31, B2.1, B2.2Date: 08/29/2011Location(s): Pittsburgh, PennsylvaniaOffice(s): Fossil Energy, National Energy Technology Laboratory
SoloPower, Inc. Electrodeposition-based Solar Panel Manufacturing Facilities CX(s) Applied: B1.31 Date: 08/15/2011 Location(s): Oregon, California Offices(s): Loan Guarantee Program Office
Solid State Batteries for Grid-Scale Energy StorageCX(s) Applied: A1, A9, B1.31, B3.6Date: 07/11/2011Location(s): Hayward, CaliforniaOffice(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory
Aptera All-Electric and Hybrid Electric VehiclesCX(s) Applied: B1.31, B5.1Date: 06/20/2011Location(s): Grand Rapids, MichiganOffice(s): Advanced Technology Vehicles Manufacturing Loan Program, Loan Guarantee Program Office