Compressed Air System Replacement CX(s) Applied: B1.31, B2.2 Date: 04/20/2012 Location(s): New York Offices(s): Naval Nuclear Propulsion Program
Prosser Hatchery Backup Generator Replacement CX(s) Applied: B1.31 Date: 04/16/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Electric Discharge Machining Projects CX(s) Applied: B1.31Date: 04/11/2012 Location(s): TennesseeOffices(s): Y-12 Site Office
Captain Jack-Olinda RAS LLL/LT Replacement Project CX(s) Applied: B1.31 Date: 03/26/2012 Location(s): California Offices(s): Bonneville Power Administration
Materials and Fuels Complex (MFC) Contaminated Equipment Storage Building (CESB) Conversion Scope Change CX(s) Applied: B1.31 Date: 03/15/2012 Location(s): Idaho Offices(s): Nuclear Energy
Project Eagle Phase 1 Direct Wafer/Cell Solar Facility CX(s) Applied: B1.31 Date: 01/24/2012 Location(s): Massachusetts Offices(s): Loan Guarantee Program Office
Installation or Relocation of Machinery and Equipment CX(s) Applied: B1.31 Date: 01/13/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Improving Recycling Capacity and Solid Waste Education in American Samoa CX(s) Applied: B1.31, B1.35, A9 Date: 12/21/2011 Location(s): American Samoa Offices(s): Golden Field Office
Regional Test Center Project: Solar Technology Acceleration Center (SolarTAC) CX(s) Applied: B1.15, B1.31, B5.15 Date: 12/20/2011 Location(s): Colorado Offices(s): Golden Field Office
Install Additional Expanded Basin Storage Racks CX(s) Applied: B1.31 Date: 12/15/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office