The scope of the C-Area Ground Level Parking Project involves the alteration of two temporarygravel parking lots into a permanent asphalt parking lot…
The scope of the A7 Office Building project includes the design and construction of a multi-storyoffice building located within the parking lot in a …
Demolish and remove from site both T43 and T45 and finish area to grade with seed and straw. …
Demolish existing electrical interconnect and install a pre-fabricated enclosure, switchgear, switching station, and support equipment.…
The US Department of Energy (DOE) proposes to modernize and expand the capacity of the LawrenceBerkeley National Laboratory (LBNL) Grizzly Peak Sub…
Demolition of buildings 11-54 and 11-54a. Tasks would involve the cutting and capping of the utilities, abate any asbestos within the facility, dem…
Remove building 707-11F and dispose in C&D Landfill.…
MOX-Termination has determined that portable building SRS-PB-EX-0027 is now excess.…
Building 616-G has reached an end state and will be demolished.…
Handi-House, SRS-PB-00514, is to be demolished due the structure collapsing.…