Western Area Power Administration (WAPA), Rocky MountainRegion (RMR), proposes to remove the modular Alternate Control Center (ACC) building from i…
Deactivation of 690-N Ford Building and Ancillary Structures and Equipment in preparation for Decommissioning (Demolition) of the facility.…
"The scope of the CX Dump Tank Complex Demolition and Site Restoration project includes demolition of all of the components making up the CX Dump...
The scope of the G Building East Renovation Project includes asbestos abatement of window caulking, floor tile and mastic.
Western Area Power Administration (WAPA), Rocky MountainRegion (RMR), proposes to demolish the Cody Service Center Building 2 in Park County,Wyomin…
The structure identified for demolition is the X, Y, and Z Wings of building 202 (XYZ Wing). …
Removal of the 10-inch abandoned steam line, containing non-asbestos insulation per SDD-APG-2016-01366 asbestos inspection document. Steam pole rem…
The scope of the Upgrade to the Environmental Mechanical Test Facility (EMTF) Infrastructure project is to refurbish a portion of the facility...
The scope of the Waste Processing (WP) Building Demolition and Site Restoration project includes removal and disposal of the building, slab...
The U.S. Department of Energy proposes to install a temporary tensile (tent-like) structure in its "Old Town" area to provide centrally located, in…