The Savannah River Site Community Reuse Organization (SRSCRO) shall furnish labor, material, equipment, tools, PPE, and supplies necessary to perfo…
Buildings 14 and 45: replacing the Building 45 and Building 14 (telephone room) chilling systems.…
Building 704-20N is a double-wide trailer that was used as an administrative office for radiological control operations personnel. The building's …
The BAC behind B5 will be demolished as per the attached SOW.…
Five office trailers and one bathroom trailer in L-area will be removed and replaced.…
The partial closure of the F-Area Inactive Process Sewer Line (FIPSL) Treblers (904-108G and 904-47G).…
The proposed project would provide greater resiliency at the data centers in Building 12-37. The electrical system would be split into two separat…
The back panel from Structure 660-20E will be removed and placed on another structure located nearby. The remaining Structure 660-20E (metal framin…
Building 728-N was formerly a shipping cask and railroad car repair facility. It is no longer an active facility, all utilities have been isolated,…
The U.S. Department of Energy proposes projects to remediate and restore the Bayview Planning Area Parcel 1 (the Bayview Parcel 1 Cleanup Project) …