Replace Potable Water Supply Lines: Phase Two CX(s) Applied: B1.3, B1.16, B1.32, B2.2 Date: 09/16/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Heating, Ventilation, and Air Conditioning Upgrades of the Field Test Laboratory Building and the Solar Energy Research Facility at the National Renewable Energy Laboratory South Table Mountain Campus CX(s) Applied: B1.16 Date: 09/13/2013 Location(s):...
Development Concept of Operations Improvement Project CX(s) Applied: B1.3, B1.16 Date: 06/05/2013 Location(s): Tennessee Offices(s): Y-12 Site Office
B903 Renovation CX(s) Applied: B1.16, B1.29, B2.1, B2.5 Date: 04/10/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Categorical Exclusion Determination
C-CA-CAM Building Complex Demolition and Site Restoration CX(s) Applied: B1.11, B1.16, B1.17, B1.23, B1.24, B1.27, B1.30, B1.33, B1.34 Date: 01/09/2013 Location(s): Pennsylvania Offices(s): Naval Nuclear Propulsion Program
Washington River Protection Solutions LLC - Asbestos Removal CX(s) Applied: B1.16 Date: 12/14/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Mission Support Alliance Annual Categorical Exclusion for Asbestos Removal under 10 CFR 1021, Subpart D, Appendix B CX(s) Applied: B1.16 Date: 12/05/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Asbestos Abatement Actions CX(s) Applied: B1.16 Date: 11/19/2012 Location(s): Tennessee, California, California, Virginia Offices(s): Oak Ridge Office
Ventilation Activities CX(s) Applied: B1.4, B1.16, B2.1, B2.3 Date: 11/19/2012 Location(s): Tennessee, California, California, Virginia Offices(s): Oak Ridge Office