Deactivation of Hollifield Radioactive Ion Beam Facility Located in Building 6000 at the Oak Ridge National Laboratory CX(s) Applied: B1.16, B1.31, B3.10Date: 10/15/2015 Location(s): TennesseeOffices(s): Oak Ridge Office
CHPRC Asbestos Removal CX(s) Applied: B1.16Date: 10/14/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
Demolition of Buildings 18, 27, 27A, 28, and 30 CX(s) Applied: B1.16, B1.23, B1.34Date: 09/25/2015 Location(s): West VirginiaOffices(s): National Energy Technology Laboratory
Ross Warehouse Asbestos and Lead Paint Abatement CX(s) Applied: B1.16Date: 09/21/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Excess Beryllium Contaminated and Other High Risk Equipment CX(s) Applied: B1.16, B1.23Date: 09/14/2015 Location(s): MissouriOffices(s): Kansas City Site Office
NWTC Bldg. 251 Roof & RTU-1 Replacement Project, NREL Tracking No. 15-007 Award Number: DE-AC36-08GO28308 CX(s) Applied: B1.16, B2.5, B1.14, B5.1, DOE/EA 1914 National Renewable Energy Laboratory (NREL) Date: 06/05/15 Location(s): CO Office(s):...
Demolition of F0 Trailers CX(s) Applied: B1.16, B1.23Date: 05/27/2015 Location(s): IllinoisOffices(s): Fermi Site Office
Main Ring Service Buildings E2 and E3 Demolition CX(s) Applied: B1.16, B1.17, B1.23Date: 04/23/2015 Location(s): IllinoisOffices(s): Fermi Site Office
N2 Dewar Pad Renovation and Building 73 Demolition CX(s) Applied: B1.16, B1.23, B2.5Date: 41845 Location(s): PennsylvaniaOffices(s): National Energy Technology Laboratory
Tucson Substation - Asbestos Abatement CX(s) Applied: B1.16 Date: 06/03/2014 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region