B-922 Sprinkler System Replacement CX(s) Applied: B1.15, B2.2, B2.5 Date: 09/25/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Office of Secure Transportation Multiple Actions CX(s) Applied: B1.2, B1.3, B1.11, B1.15 Date: 09/25/2013 Location(s): Tennessee Offices(s): Oak Ridge Office
North Parking Lot High Level Waste Canister Fabrication and Concrete Pad Construction CX(s) Applied: B1.15, B1.23 Date: 09/19/2013 Location(s): New York Offices(s): West Valley Demonstration Project
Building-922 West Office Renovation: 2nd Floor CX(s) Applied: B1.15, B2.2, B2.5 Date: 09/16/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Infrastructure Modification for the Mobile Plutonium Facility (MPF) at the 645-N Complex CX(s) Applied: B1.15 Date: 09/13/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Cable Plant Study Corrections CX(s) Applied: B1.15, B2.5 Date: 09/11/2013 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Buildings 7-11 Sidewalk Replacement CX(s) Applied: B1.15, B2.1, B2.5 Date: 09/11/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Arc Flash Hazard Mitigations - Pittsburgh CX(s) Applied: B1.15, B2.5 Date: 08/27/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Long Baseline Neutrino Experiment Future Stockpile Site Preparation CX(s) Applied: B1.15 Date: 08/20/2013 Location(s): Illinois Offices(s): Fermi Site Office
Particle Physics Division Outback Garage CX(s) Applied: B1.15 Date: 09/19/2013 Location(s): Illinois Offices(s): Fermi Site Office