Categorical Exclusion Determinations: B1.15

Siting, Construction, and Operation of New Septic Tank, Drain Field and Fencing at the 400 Area Fast Flux Test Facility CX(s) Applied: B1.15 Date: 10/28/2013 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Biofuels Retail Availability Improvement Network - Biodiesel Infrastructure Installation CX(s) Applied: B1.15, B1.23, B5.22 Date: 10/08/2013 Location(s): Wisconsin Offices(s): National Energy Technology Laboratory
North Parking Lot High Level Waste Canister Fabrication and Concrete Pad Construction CX(s) Applied: B1.15, B1.23 Date: 09/19/2013 Location(s): New York Offices(s): West Valley Demonstration Project
Building-922 West Office Renovation: 2nd Floor CX(s) Applied: B1.15, B2.2, B2.5 Date: 09/16/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Infrastructure Modification for the Mobile Plutonium Facility (MPF) at the 645-N Complex CX(s) Applied: B1.15 Date: 09/13/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office