Installation of a Concrete Pad East of Building 241-149H CX(s) Applied: B1.15Date: 41807 Location(s): South CarolinaOffices(s): Savannah River Operations Office
City of Las Vegas Solar Installations CX(s) Applied: B1.15, B5.16 Date: 06/13/2014 Location(s): Nevada Offices(s): Golden Field Office
Storm Shelter Installation and Related Activities at the Weldon Spring, Missouri, Site CX(s) Applied: B1.15, B3.1 Date: 06/11/2014 Location(s): Missouri Offices(s): Legacy Management
Support Buildings CX(s) Applied: B1.15 Date: 06/03/2014 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Establishment of a MOX Laydown Yard in an Existing Asphalt Parking Lot South of Building 782-3A CX(s) Applied: B1.15 Date: 05/22/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
H-Area Vehicle Barrier Installation CX(s) Applied: B1.15 Date: 05/14/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Arc Flash Hazard Mitigations - Morgantown CX(s) Applied: B1.15, B2.5 Date: 05/12/2014 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Solar Energy Parking Canopy Demonstration Project CX(s) Applied: A9, B1.15, B5.16 Date: 05/05/2014 Location(s): California Offices(s): Golden Field Office
Installation of New Modular Laboratory (235-S), Relocation of Administrative Trailer (704-64S), and Disconnection and Removal of Laboratory Trailers CX(s) Applied: B1.15 Date: 04/16/2014 Location(s): South Carolina Offices(s): Savannah River Operation...
Lease Extension for the Existing Leased Space for the Office of the Chief Financial Officer CX(s) Applied: B1.15, B1.24 Date: 04/15/2014 Location(s): California Offices(s): Berkeley Site Office